- Featured in:
Find out what is the best resume for you in our Ultimate Resume Format Guide.
Additional Energy Resume Samples
Control Engineer Resume Samples
No results found
6-10 years of experience
Responsible for corrective action plans, led Aircraft Systems Specialists, Production Specialists and maintenance teams to solve test squawks, utilized workaround procedures to restore and enhance functional integrity and system readiness. Applied Define, Measure, Analyze, Improve, and Control methodology to increase quality improvement per design for Six Sigma continuous improvement standards.
- Supported full rate of production, increased aircraft sales to 28 aircraft units from the low rate of 12.
- Performed EVMS to track 98% budgeted cost for work scheduled, actual cost of work performance, measurement baseline, cost and schedule variance.
- Assessed and managed 95% of potential risks through risk identification, assessment, response development and response control.
0-5 years of experience
Implemented and administered documentation project requirements to deliver finished product consistent with scope, means and methods as developed and incorporated into Contract Documents. Minimized, organized and controlled documents for optimum project documentation flow.
- Ensured project document control expectations and goals were effectively communicated to all project levels and functions.
- Guaranteed compliance of document control requirements with company guidelines and policies to meet internal and external needs.
- Evaluated, developed and implemented improved techniques for proper control of documentation, in collaboration with client information and technology groups, architect / engineer, all subcontractors, reprographic company.
- Maintained project documentation across various platforms including DFS (Skanska) project website, dedicated project server common drive, and Prolog.
- Managed training of administrative assistants for coordination of daily office functions, maintaining highly professional work environment.
0-5 years of experience
Responsible for leading a team to execute and deliver project specific documentation on time to prevent costly delays
- Collaborated with a multi-disciplinary team to: develop cost-efficient control panels and standardize PLC/HMI/Documentation for various machines to optimize performance and execution
- Created PLCs/HMIs that supported operator productivity by providing full-featured screen displays and machine specific programs.
- Commissioned new machines in cement plants during allocated time, which helped to decrease plant maintenance costs and downtime
- Developed Control and Instrumentation documentation (C&ID’s), specifications, instrument and signal list, 1 phase load lists and 3 phase load lists for various stand alone machines
- Developed control panel documentation for various machines and tested the panels at local panel shops in order to insure on time delivery
- Resolved unforeseen issues to guarantee continuous customer satisfaction and build long-lasting relationships
- Supported commissioning team remotely to ensure fast start-up in order to prevent unnecessary plant downtime
- Wrote detailed procedures/manuals to serve as training material and future reference
- 24-Hour MSHA safety trained
0-5 years of experience
Implemented and administered documentation project requirements to deliver finished product consistent with scope, means and methods as developed and incorporated into Contract Documents. Minimized, organized and controlled documents for optimum project documentation flow.
- Ensured project document control expectations and goals were effectively communicated to all project levels and functions.
- Guaranteed compliance of document control requirements with company guidelines and policies to meet internal and external needs.
- Evaluated, developed and implemented improved techniques for proper control of documentation, in collaboration with client information and technology groups, architect / engineer, all subcontractors, reprographic company.
- Maintained project documentation across various platforms including DFS (Skanska) project website, dedicated project server common drive, and Prolog.
- Managed training of administrative assistants for coordination of daily office functions, maintaining highly professional work environment.
10+ years of experience
Reduced process alarms by 65%.
- Improved regulatory loop performance by 40%.
- Tracked and reported process control metrics and identified and implemented improvements.
- Troubleshoot and repair process control equipment programs and hardware.
- Improved process operations cost and reliability through improving existing PLC and DCS programs and through implementing new PLC and DCS programs.
- Managed process control systems planning, purchases, installation, commissioning and start-up on capital and expense projects.
- Trained process operators and electrical and instrumentation technicians on both regulatory and supervisory controls.
0-5 years of experience
- Installed new Cimplicity HMI Servers and GE 90-30 PLCs during facility control system upgrade
- Designed Cimplicity HMI control system including data logging, building graphics, trending, scripts, navigation, alarm management, data monitoring and equipment controls to improve operation efficiency
- Updated and modified GE 90-30 PLC control logic for new equipment installation
- Maintained and supported Cimplicity PLC and HMI systems to ensure facility operations and customer satisfaction.
- Performed multiple Cimplicity server change outs including installing ELDS and RTU software to improve control system reliability
- Assisted in checking out and troubleshooting various Cimplicity control system analog and digital I/O signals such as governor position feedback, breaker signals, and gate position feedback
10+ years of experience
Sustain and improve Wet Etch and Metal Plating processes. Create Advanced Process Control (APC) from real-time process data collection to enable Fault Detection and Classification (FDC) and improve quality control. Establish procedures on creating data analysis strategies for Quality Assurance of company FDC applications.
- Reduced HF etch rinse times 50% and resolved a 2Ã… shift in Gate Oxide.
- Improved tool availability using Predictive Preventative Maintenance algorithms.
- Reduced scrap and yield loss by >75% with Multi-Variate Analysis of process run data.
- Support company’s Advanced Process Control rollout with a multi-year Roadmap connecting FDC to other applications used by Engineers and Technicians.
0-5 years of experience
Managed, transferred, and implemented the real time SPC technology to mass production in Thailand.
- Established and implemented Statistical Process Control systems. This included sampling plans, sample size, sampling frequency study, then implemented the out-of-control action plan.
- Supported root cause and data analysis for defect reduction and process yield improvement.
- Provided reports and reviewed process capability studies with engineers for process improvement and variation reduction.
- Evaluated precision and accuracy of testing, measurement, and production equipment by performing GR&R and MSA to maintain and improve metrology system.
- Provided SPC (Statistical Process Control) training for operators, technicians, and new hires.
- Supported R & D for new product and process developments including Process Characterization by using Partitioning of Variation (POV), Design of Experiment (DOE) and Data Analysis.
0-5 years of experience
- Accomplished a project of evaluating the interlace machine (YT-3) by testing, analyzing and comparing physical properties of products.
- Effective communication with the management and met the goals successfully
- Participated in internal audit program and assisted to plan and implement company vendor audits.
- Created test procedures (flowchart) to build up the SOP of the interlace machine (YT-3).
- Reviewed SOPs with QC managers, to maintain the Quality.
0-5 years of experience
Responsible for managing and coordinating supplier surveillance inspections for water treatment equipment including FRP and Carbon Steel Tanks, Pressure Vessels, Filter Presses, Gravity Filters, Clarifiers, Agitators, Pumps, Skidded Equipment, and Structural Steel.
- Assigned 3rd party inspectors for various inspection assignments based on qualifications, availability, and cost.
- Prepared and issued inspection assignment packages consisting of Inspection and Test Plans, Purchase Orders, applicable Drawings and Specifications, and Siemens reporting forms.
- Reviewed and internally distributed inspection reports, punch lists, and non-conformance reports.
- Interfaced with suppliers, inspectors, and clients to resolve outstanding punch list items and non-conformances prior to issuing release for shipment.
- Maintained electronic copies of all records related to completed inspections.
- Participated in Project Review Meetings and reported on the status of inspections.
- Assisted in the development and maintenance of Quality System procedures and forms.
0-5 years of experience
- Led the efforts to audit existing procedures, identified critical gaps, designed and wrote new corrective procedures in accordance with ISO 9001 standards
- 75% reduction on ISO 9001- 2008 audit finding
- Generated new strategies and plans for improving quality of the processes
- Initiated a system of accountability for production associates
- Implemented and computerized standard work documentation which translated to a saving of $20,000 per year
- Maintained and managed internal audit plans
- Planned, promoted, and organized training systems on all newly implemented procedures and requirements company wide
0-5 years of experience
Obtained ODOT Level 2 Asphalt Technician Certification, Completed CPN International manufactures training course on Radiation Safety and Use of Nuclear Gauges, with training per 49 CFR 172.
- Supported Quality Control Manager and directed technicians to obtain inaugural AASHTO Materials Reference Laboratory Certification including authoring Criteria Compliance Document, proficiency sample program, and on-site assessment protocol.
- Coordinated quality control efforts of heavy highway construction projects through evaluating and adjusting production procedures to meet private, state, and federal specifications.
- Sampled, tested and calculated asphalt and aggregate compositions at production site to meet state and federal compensation standards.
- Responsible for lab testing facilities across multiple job sites.
6-10 years of experience
Control Engineer Responsible for the safe and continuous operation of the Marcus Hook Refinery
- Developed and maintained advanced control schemes on Fox 1/A
- Supported the GCS Setcon interfaces
- Implemented alarming systems to aid in safe operation
0-5 years of experience
Provided assistance to Quality Department to perform testing on Thermoplastic Pipes and determine
rupture pressures.
- Reviewed and resolved any technical problems/issues which may have been discovered during factory
- Examined and ensured that pipes meet specific technical requirements.
- Closely involved with Engineering Department to gather data and evaluate of new products for the oil and gas market.
- Collaborated with Production Department during factory assembly of project specific pipe.
0-5 years of experience
Provided assistance to Quality Department to perform testing on Thermoplastic Pipes and determine rupture pressures.
- Reviewed and resolved any technical problems/issues which may have been discovered during factory testing.
- Examined and ensured that pipes meet specific technical requirements.
- Closely involved with Engineering Department to gather data and evaluate of new products for the oil and gas market.
- Collaborated with Production Department during factory assembly of project specific pipe.
0-5 years of experience
- Addressed day-to-day supplier quality, production and NPI issues for the Fuel Systems (Critical Core Nucleus) parts like solenoids, fuel filter, valves and precision components from 10 suppliers
- Achieved 2013 team goal of maintaining overall PPM numbers implementing No Fault Forward techniques for all of my Fuel System products worth $15million YTD spend.
- Facilitated timely responses from Global Purchasing Large After-Treatment Department while ensuring the progress of the new components in the CAT APQP Management Tool
- Engineering deviation management to obtain approvals and/or advanced engineering changes from engineering. Initiated and tracked Process Change Notification to ensure on-time approval
- Reviewed and approved supplier On-Time PPAP submissions; Assisted suppliers in obtaining quality certification based on PPM and shipment performances
- Involved in resourcing and supplier transition projects; Held regular meetings with stakeholders to ensure proper transition per CAT Manufacturing and Quality Standards
0-5 years of experience
Inspected mechanical and electrical assemblers, pc boards, and manufactured process of aircraft parts and equipment for Chinook and Black Hawk helicopters and avionics trainer.
- Checked equipment controls, gages hydraulics, electronics meters and instruments.
- Performed functional and operational checks of aircraft’s major components like propeller, and maintenance procedures.
- Conducted functional testing of manufactured items
- Participated in internal audits for government compliance to fulfill specific contract requirements
0-5 years of experience
- Developed cost breakdown structure (CBS) and baseline budget of the project and worked close cooperation with accounting department to establish project cost codes.
- Maintained and updated the cost report with budgets, actual / committed costs, forecast for hours, materials, construction, other charges/expenses and revenues.
- Provided recommendations to predict future events through quantifiable trend analysis, automated tracking tools and engineering models as they pertain and align to Earned Value Management System (EVMS).
- Discussed variances and delays with the project manager and suggested remedial actions to mitigate the delays and concluded risks.
- Attended technical and contractual meetings as a key member of the project team.
0-5 years of experience
Responsible for supporting process control systems in the Paper Mill area including managing three contract maintenance employees.
- Learned detailed programming skills for Distributed Control Systems and PLCs.
- Renegotiated new service contract for three contract maintenance employees.
- Provided product quality performance data for all three paper machines on a monthly basis.
0-5 years of experience
Maintained, analyzed, and optimized semiconductor manufacturing processes
- Designed and qualified various tests, testing equipment, and test fixtures to support production
- Created and updated SOP’s, maintenance manuals, and technical memorandums
- Ran experiments to benchmark, test, qualify, and optimize new processes
- Designed custom tooling to support process improvements and technology transfers
- Managed and maintained all related tools by making hands-on repairs and service calls
- Managed and instructed technicians to ensure that processes were run according to procedures
- Independently developed and optimized new manufacturing technology applications
0-5 years of experience
Customer Quality Engineer contact for Harley-Davidson, Honda and Kawasaki
- Facilitated projects to improve and maintain product quality
- Oversaw the quality inspection of outgoing and incoming parts
- Created and reviewed PPAPs for new model and running change events
- Traveled to Pennsylvania, Missouri, Wisconsin, Vietnam, Thailand and Japan as company representative for future business interests
0-5 years of experience
- Provided leadership, conducted training and ensured certification for a crew of 16 technicians.
- Contributed to a CFT that qualified a sub-contractor for military testing of integrated circuits. Reduced cost by nearly 40%.
- Created databases to record operator output to track test system and hardware utilization.
- Reviewed all proposed changes to production specifications to ensure compliance with corporate standards.
- Responded to CAR’s issued to the test floor by performing an analysis of the defect, determining corrective action responses and monitoring the results.
- Assisted the Quality Department during the implementation of ISO 9000 standards and achieved certification.
- Developed work assignments and reviewed quality and volume results to ensure clear definition of expectations.
- Held weekly QIM (Quality Improvement Meetings) with the crew where defects were discussed and analyzed. Substantially improved production line performance and reduced cycle time.
- Met weekly with management to review department status and planned actions.
- Tracked and summarized performance results to management each month, including volume and quality measurements, QIM project status, and personnel development results.
0-5 years of experience
Conducting daily inspection of all site activities regarding architectural and structural work.
- Reviewed shop drawings, materials and compliance statement before submitting to the consultant.
- Closing the NCR’s in co-ordination with Management Representative/Quality Manager.
- Analyzed internal defects, took corrective and preventive actions to avoid project delay and financial loss.
- Prepared and maintained ITP, PQP, QA/QC documents.
- Observed work in progress to ensure that the procedures followed and materials used conform to specifications.
- Examined quality of finished installations for conformity to standard and approved installation.
- Coordinated testing laboratory technicians and interpreted test results.
- Recorded quantities of materials received or used during specified periods.
- Maintained daily log of construction and inspection activities.
- Mivida Estate Villa & Palmera Town House: USD $350M compound including 130 acres of development with 300 structures. Project Manager: Turner, Client: EMAAR.
0-5 years of experience
Write Series of Event reports and Incoming Quality Control Checklists
- Tested and assembled EVSE Wall Mounted Car Chargers for fully electric vehicles.
- Compiled all materials necessary for various manufacturing projects.
- Handled incoming and outgoing quality control for high priority shipments.
- Trained and allocated new employees to correctly follow procedure on various assignments
6-10 years of experience
Worked with process area to identify critical equipment status variables to monitor in FDC.
- Created FDC strategies in Maestria system. Configured main process step data analysis, set limits and email/page process area for FDC alarms.
- Converted FDC Maestria strategies to FDC E3 strategies for CMP per management requirement after Maestria being used for three years. Added logging down equipment and lot hold capabilities in E3 FDC.
- Performed FDC training to Engineers, Technicians and Operators.
- Supported FDC strategies for CMP area. Worked with CMP process engineers and equipment engineers to prevent excursion. Successfully detected equipment fault from HPR flow valve malfunctioning, platen transmission belt loosing, IPA level and DIW flow too low, and etc. Reduced equipment fault related excursion significantly.
- Worked with CMP process area to document procedures how to handle FDC alarms. Updated this document when FDC configuration changes.
- Worked on 40S, 60S, 80S NAND, DRAM and NOR process transfer projects. Compared sending fab and receiving fab TOPO lots and lead lot critical FDC trace data. Identified recipe set up issues, sensor issues and equipment constant configuration issues. Recognized by the management.
- Managed process transfer projects for FDC configuration. Scheduled FDC configuration for each part type, each processing steps and each process area. Reported FDC configuration status to the management and FDC team. Addressed configuration issues.
6-10 years of experience
Joined a cross functional and dynamic engineering team as part of control and protection design of power transformer and mobile substations for private customers and public utilities. I am in charge of design, supervision and assembly of each project as per customer specifications meeting their particular requirements for each unit built.
- Design, development and implementation of control and relay protection systems for power transformers and mobile substations per company quality standards and as defined by the project scope and customer objectives.
- Responsible for project tracking, risk analysis, expected project cost, and ensured proper documentation of project.
- Coordinate and manage external vendors to ensure timely delivery of required project material.
- Provide technical support to assembly department and test technicians to verify operation of equipment and to improve control and protection system designs.
- Successfully manage at the same time a minimum of 6 independent projects at different stages.
- Identify areas of improvement and communicate lessons learned to engineering team for best practices.
0-5 years of experience
- Programmed, Oversaw, and Designed fixtures for CMM equipment
- Performed Failure Analysis on parts that failed in testing or service
- Composed Reports to summarize findings
- Created SOP’s for metrology equipment and measurement processes.
- Used CPK Analysis to study manufacturing process capability.
- Troubleshot and resolved quality issues as they arose; Used root cause analysis.
0-5 years of experience
- Familiarized/maintained warehouse inventory; re-stocked weekly, increased supply availability by 25%.
- Organized and improved STS’s QuickBooks account, as well as helped develop the STS website.
- Created AutoCAD drawings of oilfield merchandise.
- Acquainted myself with health and safety working practices and procedures in the oil field industry.
- Assisted superior in different assignments: purchasing merchandise, company events, etc.
- Recipient, President’s Scholar-Athlete Award 2014
- Awarded the STEM (Science, Technology, Engineering, and Mathematics) Scholarship 2013
- Accomplished Dean’s List (above a 3.5 GPA on semester with over 16 hours) 2013
10+ years of experience
- Evaluated production electronic home entertainment systems
- Addressed customer field failures and drove corrective actions
- Member of development team that developed and transitioned a 4 channel
- Designed 1 kilowatt switching power supply and switching audio amplifiers.
- Designed, built, troubleshot and evaluated audio components and systems for home and professional audio.
- Evaluated and demonstrated the latest video display media including plasma and digital micro mirror devices
0-5 years of experience
Extensive experience with locomotive Engine Controls team where I participate in all stages of design, development and testing of NPI projects
- The controls designed for Engine Management System(EMS), Engine Control Unit(ECU) and Engine Cooling System(ECS) is paramount to engine performance, allowing the locomotive to function without damage while in long tunnels and during extreme ambient conditions.
- Reviewed requirements from system, subsystem, component levels and update System Design Specification in IBM Rational DOORs 9.3/9.5
- Implemented designs in Mat Lab Version 6.5 including Simulink blocks, State flow diagrams, m-file for Delta T protection function, Radiator and Air to Air Fan control strategy.
- Composed and published validation plans, DFMEAs, Traceability Matrix and scorecards on Delta T protection, Static leak detection function and Cooling system control functions
- Update Test and Validation plans for Engine Management System (EMS), Engine Control Unit (ECU) and Engine Cooling System (ECS)
- Validate design in Lab (Simulator) and Field Environments (Locomotive) and presented the results in Informal Technical Review (ITR) and Formal Design Review (FDR)
- Support Software Enhancements project of Union Pacific (UP) by developing Object and subroutine for Engine Management System
- Troubleshooting factory and field issues as member of Fault Analysis Manual (FAM) review team.
- Work closely with the Principle Engineering office to ensure technical depth and rigor of projects
0-5 years of experience
- Developed a master validation plan for lab chemistry analyzers; performed IQ, OQ, PQ; analyzed lot linearity/homogeneity.
- Validated a test method, cross over study for the transfer of value assignments from obsolete instruments to next generation.
- Analyzed trials for pilot production runs via Minitab; investigated source of error in accuracy and precision of formulation.
- Originator of ECO’s, configured collaborations packets in MasterControl, edited instrument SOP’s and trained lab tech’s.
0-5 years of experience
Controller Design for Gas Engines based on Classic Control (PID) and Gain Switching, using Simulink
- Controller Design using advanced methods: Sliding Mode, Adaptive Control and Fuzzy Model Based
- Controller implementation on ECU and xPc Target
- Controller Test, Tuning and Engine Calibration using CANape
- Controller simulation using GT Power, Ricardo
0-5 years of experience
- Performed configuration and testing of Wireless RTU devices for HMI, DCS and SCADA systems
- Prepared the logic flow diagrams, loop diagrams and ladder logic for Programmable Logic Controller (PLC) system using RSLogix 5000.
- Worked on Total Access software for reporting, analyzing, searching, manipulating and integrating large data collected from RTU installed in the field for SCADA systems.
- Performed HMI configuration for Well Shutdown System using EZWare 5000 software.
- Tested RTU’s application modules such as POC (Position of Controller), Wet Gas Detection, MSV (Motorized Solenoid Valves), PID, AGA 3 & 8, Alarm Manager, Data Logger, Report Generator & Mailer, Web Server and Message Logger to prove functionality.
- Analyzed performance and documented product defects of the tested RTU modules to improve product quality.
- Interfaced with vendors as well as field technicians over phone to provide Product Support and Field Service.
- Scheduled the project and developed project timelines, and ensured its compliance.
- Coordinated with the client and vendor to resolve all problems and ensured that the work progresses according to the requirement.
- Facilitated and analyzed the project in the team meetings and ensured that all customer requirements were met.
0-5 years of experience
Responsible for the precious metal coating of gasoline catalysts, including immediate actions required to set up, monitor, and troubleshoot the equipment associated with manufacturing, while controlling the production process
- Coordinate with management to ensure timely system changeovers, high health and safety standards, and proper raw material requirements to meet the production schedule, while attaining productivity and quality
- Support the standardization, continuous improvement, and implementation of new technology through creation of new procedures and training of personnel
- Lead efforts to optimize the process by contributing to various kaizen teams
- Heavily involved operating the newest production line
0-5 years of experience
- Assumed responsibility of the Quality System in the absence of the Quality Assurance Manager.
- Led and coordinated TS 16949 external audits conducted by 3rd party organizations.
- Performed root cause analysis for all customer complaints and audit non-conformances (internal and external) and led subsequent corrective action response, implementation, and verification of those countermeasures.
- Updated Control Plans, PFMEA’s (RPN reduction), and other Quality System documentation related to corrective action response, lean six sigma continuous improvement projects, and manufacturing process audits.
- Presented monthly Quality Management System presentation to Executive Management Team reporting on key performance indicators associated with the Quality system.
- Acted as the main point of contact for all quality issues with customers (internal and external), external suppliers (SNN process), and external auditors.
- Initiated continuous improvement projects relative to PPM reduction, customer complaint reduction, Best Practice read across, and MEQS (PGW Corporate Quality metric).
- Developed and implemented plant-wide 5S Program.
0-5 years of experience
Utilized 3D software to create model renderings for a client’s needs
- Created new projects and schedules with Oasis software
- Assisted in product selection for control projects
- Designed spec sheet packages for distributors
0-5 years of experience
Programming, installation, troubleshooting and repair of most of the Siemens product line.
- Work closely with turnkey contractors on integration of new equipment and controls at Chrysler Plants, GM Plants and other companies.
- Integration and programming of machine operator controls and logic associated with WinCC Flexible 2008.
- Responsibilities include customer support with connectivity to Data logic bar code scanners. Protocols of Ethernet, Profibus DP, RFID and serial communication to Siemens S7-300 PLC, OEM equipment and a host PC.
- Set-up, configuration, installation, and maintenance of Data logic bar code scanners.
- Troubleshoot machine systems to include programming functionality, communication devices, servo tuning, VFD configuration, and 480 vac 3-phase motors.
- Preformed the daily function of a service manager from management to hiring of employees.
0-5 years of experience
- Developed maintenance procedures for Demag 15-ton Cranes and Clarke -Detroit Diesel Fire Pumps
- Developed a Quarterly Corrosion Control Report which identified budget concerns, risks to facility readiness, and enhancements of the Corrosion Control Program.
- Evaluated the timeliness of discrepancy resolution and made recommendations for prioritizing.
- Evaluate the accuracy of corrosion reporting and correct reporting discrepancies.
- Developed Project Estimating Worksheets, Ranking Justifications, and AF forms to add projects to the Air Force Sustainment List
- Acted as Systems Administrator for software which housed Facility Condition Assessment data for Air Force facilities.
0-5 years of experience
Programmed automated body part delivery systems for BMW’s body shop.
- Siemens Step 7, WinCC HMI’s conveyors, monorail and safety systems.
- Converted multiple systems for new BMW F25 standard.
- Programmed new conveying systems enabling automated truck delivery.
- Trained operations staff on equipment use.
- Pilz, SICK Laser Scanner systems programming.
0-5 years of experience
FDA-regulated facility. Primary responsibility is to perform unit support and project support for control system work in the FERMENTATION department.
- 7,000 pt Provox DCS comprising 19 UOCs 3 Provue systems and OWP.
- Significant batch operation.
- Participated in problem solving meetings using formal tools such as Pareto charts, 5 why’s, and impact tables.
0-5 years of experience
- Worked with maintenance department to upgrade systems per manufacturing requirement;
- Restored an old automated production line back to production capacity;
- Supported manufacturing process with software, HMI and hardware trouble shooting and modifications;
- Modified Allen-Bradley PLCs, WonderWare, Adept robot codes and various mechanical/electrical parts to support manufacturing;
- Supported and Updated MES.
0-5 years of experience
- Developed PLC (Simens S7200, S7300) based control system.
- Created Human Machine Interface (HMI) control and monitor with SIMATIC HMI and WinCC.
- Developed PROFIBUS industrial communication between PLC, HMI and transformers for DCS.
- Created new wireless communication based on broadcast station to realize SCADA system and Integrate control systems, reduced system cost.
- Specific controlled transformer and electric motor to control speed and location of vehicles.
- Applied rotary encoder, code card identification device and stable code disk to realize precise alignment of vehicle and coke oven.
- Developed P&ID, circuit diagrams and electrical drawings using AutoCAD to represent the system.
- Support system field installation, testing and commissioning.
0-5 years of experience
Designing and writing C/C++ programs for Crystal Grower on a QNX operating system.
- Created and maintained C/C++ code. Operating systems used QNX, Windows and DOS.
- Maintained legacy DOS software for existing customer.
- Created several Windows application for production fixtures.
6-10 years of experience
Field Engineer in charge of handling: Boiler & Machinery claims, risk assessments (HVAC, MEP and related equipment) and Jurisdictional Boiler and Refrigeration inspections for clients in New York and New Jersey
- Account Manager for the Metropolitan Transit Authority, NJIT and County of Westchester
- As Account Manager had a service budget of $500,000 for each client for risk control servicing of accounts
- Bronze Star Recipient for extraordinary service for Smurfit Stone Corp. Account
- Perform jurisdictional inspections and risk surveys for large utilities such as Dynergy and Consolidated Edison
- Received above average evaluations every year from management assessment
0-5 years of experience
Sikorsky Aircraft Corporation is a world leader in the design, manufacture and service of military and commercial helicopters; fixed-wing aircraft; spare parts and maintenance, repair and overhaul services for helicopters and fixed-wing aircraft; and civil helicopter operations.
- Executed Inspection procedures for upholding rigorous standards of aircraft conformances processes for certification by the FAA.
- Analyzed double pole double throw aircraft switches, current pitot sensors as well as IR parts and equipment for replacement due to obsolescence.
- Wire sizing design for helicopter cable, connector and harnesses necessary for powering aircraft in test environment.
- Ensured drawings & ATPs match up, corresponding to each other for aircraft fire bottle systems.
- Used PRP, PMC, Teamcenter, Canvas and other software as applicable to move documentation through approval processes for different purposes.
- Aircraft System Specification Analysis
- Mechanical Rack Power Distribution Layout.
0-5 years of experience
Challenge: Provide assistance on Instrument and Controls design packages under the direction of a Supervising Engineer and created instrument index, data sheets for various project in the power sector.
- Sizing of thermo wells and thermo couple for Entergy Hotsprings Power Plant.
- Data Sheet specification for Instruments (level gauge, pressure switch, pressure transmitters, pH analyzers, control valves, relief valves)
- Developed & Updated P&IDs for the Entergy Hotsprings Power Plant.
- Sizing of boiler control valve for Entergy Hotsprings Power Plant.
0-5 years of experience
- Performing missile control law design and analysis utilizing the LQR ( Linear Quadratic Regulator) and OBLTR (Observer-Based Loop Transfer Recovery) control architecture. Evaluate time and frequency domain properties to ensure the robustness and performance of the designed system.
- Supporting in-house guidance & control software GUI development, including software verification and validation.
- Supporting in-house 6-DOF simulation tool development to facilitate the hardware-i n the-loop process.
- Make recommendations to facilitate management plans that support control system development.
- Supported quad-rotor platform development using ROS ( Robot Operating System).
0-5 years of experience
Design and manage new projects and upgrades to High Voltage Cable manufacturing line.
- Extensive work with Siemens Step 7 and TIA Portal, as well as Mitsubishi GX Developer.
- Controls networking through Ethernet, Profibus and Profinet.
- Develop and maintain factory wide Wonderware Scada and Historian.
- Setup and programming of Siemens Sinamics and ABB frequency drives.
- Design and program HMI interfaces, with Wonderware Intouch and System Platform.
- Support and help maintain IT Department, network, and onsite servers and switches.
0-5 years of experience
Responsible for the construction, test, and deployment of Adptivolt(TM) Volt/VAR management system within the customers Substation or Data Center
- Responsible for coordinating Adptivolt(TM) testing against customers SCADA system. (DMS or TMS)
- The construction of Allen Bradly PLC, GE D200 and D20 Hardware & configuration with Config Pro 5, 6, 7
- Responsible for planning and coordinating Utilidata NERC-CIP complacency
- Responsible for training Jr. Engineers in Substation communication and Equipment testing in the lab or field
0-5 years of experience
- Worked on Honeywell Russia projects: giants of industry of Russia: Rosneft’s refinery plant (45 mln bbl per year) and TogliattyAzot (2,5 megaton ammonia per year)
- Designed technical documentation – P&ID, electrical diagram, system drawing and other
- Developed and implemented DCS (Honeywell Experion PKS) and ESD (Honeywell Safety Manager)
- Deployed control networks (Honeywell FTE)
- Programmed algorithms and designed HMI
- Completed Honeywell’s certificates: Safety Manager and Experion PKS
- Organized project team work with responsibilities of project manager and chief engineer
- Experienced working well under pressure and solving project problems: hard limited project time (6 months full project), complicated logistic, customers request changing during project time