- Featured in:
Additional Engineering Resume Samples
Senior Engineer Resume Samples
No results found
6-10 years of experience
Lead engineer for Second Shift operations. Utilized root-cause analysis and teamwork to increase product delivery. Leader of value stream mapping and process improvement to eliminate waste and non-productive activities.
- Reduced waste to increase output of ground-based lasers from 13 to 53 per month.
- Improved yield to increase portable laser production from 12 to 113 per month.
- Wrote detailed procedures for laser assembly, alignment and testing.
- Developed Lean Manufacturing and Geometric Dimensioning and Tolerancing training for manufacturing engineers.
6-10 years of experience
Reviewed and tested computer software for reliability according to government specifications and requirements.
- Documented all test findings and proposed fixes to the customer for a better product.
- Analyzed procedures to ensure the product was meeting all governmental safety requirements.
- Designed and executed test procedures, reported incidents, and worked with databases applying to the software.
- Prepares documents and resources information for the Project Manager in addition to researching and writing the Company monthly report.
- The Team Lead of a number of areas within the local company branch with [company name].
- Responsible for the Access and Excel spreadsheet database that contains the inventory of company equipment worth over $2 million.
0-5 years of experience
Active involvement in PCB designing, which reduced the PCB size by 30%.
- Directed a team of 4 associates to achieve final product design from the prototype.
- Guided 10+ college students for their final year college project based on embedded system.
- Promoted twice from intern to Junior Engineer then to Senior Engineer based on performance.
6-10 years of experience
Provide engineering skills to assist in bringing innovative and cost effective solutions requiring the development or sustaining of new products.
- Researched and conceptualized data analysis methods to improve the reliability and manufacturability of drilling and measurement tools. Implemented methods decreasing manufacturing failure rate by 5% within 6 months.
- Led internal transfer of $20M revenue per year tool during its commercialization. Directed and programmed tool
- Designed a novel board to control a hydraulic system for a motorized-wheeled arm tool to increase temperature
- Improved an electromechanical system efficiency 10% year over year for 3 years measured in MTBF by redesigning the system. Developed strong statistical analysis to structure the product design plan.
- Led field teams to perform $1M to $2M service operations to analyze data from oil & gas reservoirs. Projects
0-5 years of experience
Developed and vetted experimental products, tooling, materials, testing methods, and processes for commercialization.
- Provided technical support and training to GPC plants and personnel throughout the country.
- Invented Mold Lock Key Safety Device (United States patent […] as a solution to employee safety concerns while working around blow mold locking mechanisms.
- Created online automated box inspector (United States patent […] as a corrective action that resolved customer complaints.
- Designed Adjustable Overhanging Lamp Adapter (patent pending) to adapt high-efficiency lamps to blow molder ovens in order to improve processes while reducing electrical usage and cost.
- Developed trade secret online automated inspection system that eliminated customer complaints for a number of defects.
0-5 years of experience
- Recommended and reduced 22% in the overall inventory by identifying the common items across the plant and fixing inventory norms for Fast, Slow & Medium moving items. (M/s Jindal stainless Inc).
- Performed multiple business excellence projects for improvising the current processes within the organization.
- Involved in continuous improvement projects, Lean manufacturing, Kaizen, Kanban, Poka-yoke, TPM & 5S.
- Highly involved in supply chain consulting projects for E-commerce business such as “Amazon”, “Flip kart”.
- Developed Excel based customized automation tools sales team to increase the department thru-put & performance.
- Involved in cross functional team data capturing and business process mapping for New ERP implementation. (Infor)
0-5 years of experience
Responsible for on-site and remote troubleshooting of outages on CDMA wireless application systems and resolved customer issues and performed daily System Administrative duties.
- Managed a ten-member response team that resolved system outages, handled case escalations and 3rd line support.
- Managed the Year 2000 Support team for the Technical Support department.
- Resolved six outages within a 12-month period as the escalation lead by providing procedures and solutions for problems in the field.
- Designed 85% of the outage recovery procedures for the BSM (Base Station Manager) subsystem for a service provider supporting the 2002 Olympics in Salt Lake City, UT.
- Traveled internationally to install, commission, test, upgrade and manage systems in the field.
6-10 years of experience
Participated, and led root cause / apparent cause evaluations, and self-assessment and benchmarking activities.
- Conducted grading of Performance Improvement products (CAP Conducted evaluations, Self Assessment reports, and Benchmark reports), and provided feedback to improve performance.
- Ensured quality and completeness of the organization's evaluations and corrective action assignments.
- Reviewed, classified, and trend coded Condition Reports
- Conducted trending and analysis of organizational performance for Engineering Department.
0-5 years of experience
Testing devices for FDA submittals, characterization, verification, validation and reliability.
- Evaluating and documenting product returns from field: Patient Preference and Home Use studies. Working with clinical trials support staff and entering data into RAVE.
- Created device development models and drawings for assemblies and parts using SolidWorks.
- Wrote characterization plan for Instron tensile and compression tests and reported results.
- Verified data and conducted risk assessments, related to FDA activities.
0-5 years of experience
Designed, project managed and implemented new datacenter and re-location of all assets to that datacenter.
- Responsible for messaging in organization.
- Managed team of 8 people including server, voice and network engineers.
- Designed and implemented VMware farm and virtualized over 30% of environment.
- Designed and implemented HP SAN and Cisco SAN switch swap from EMC SAN.
- Senior engineer for backup and disaster recovery.