Project Control Engineer Resume Samples

HIGH QUALITY

The best examples from thousands of real-world resumes

EXPERT APPROVED

Handpicked by resume experts based on rigorous standards

DIVERSE EXAMPLES

Tailored for various backgrounds and experience levels

Project Control Engineers are responsible for designing and installing engineering equipment. Typical resume samples for this job mention duties like overseeing operational processes, maintaining equipment, controlling engineering systems, and making sure safety guidelines are respected. Based on our collection of example resumes, the ideal candidate demonstrates engineering expertise, problem solving orientation, attention to details, good communication skills, and time management. Employers select candidates holding at least a Bachelor's Degree in an engineering field. Previous engineering work experience is also required.

For more information on what it takes to be a Project Control Engineer, check out our complete Project Control Enginner Job Description .

Want personalized resume advice? Get a FREE Resume Review

1

Project Control Engineer

  • Managed several Federal construction projects, total budget exceeding $1 billion, including LA Subway stations, Alameda Corridor Railroad and Long Beach Port and delivered the projects on time.
  • Trained and directed 5 Project Control Analysts to perform project planning and resource & cost management, which resulted in timely completion of the projects within budget.
  • Developed budget, cost report, cash flow projections & analyses, negotiated billing with clients and ensured steady revenue stream exceeding $30 million per month.
  • Conducted production & cost benefit analyses and identified resource sharing opportunities for various adjacent projects that enabled a 10% direct cost reduction.
  • Negotiated contract change orders and delay analysis with clients, which eliminated delay penalty and won compensation for six months of extended overhead cost.
Candidate Info
8
years in
workforce
8
years
at this job
MS
Civil Engineering
MBA
Master of Business Administration
Civil Engineering
2

Project Control Engineer

Planned and prepared Level 3 schedule of 23 months in Primavera 6.0 for hydrogen gas plant project and revamp project.

  • Updated schedule in Primavera 6.0 & forecasting progress and schedule for refinery execution project.
  • Prepared monthly and weekly progress reports presented to client.
  • Assigned work breakdown structure code and cost elements for all the equipments / material procured for refinery and gas plants projects.
  • Performed delay analysis and claims for reimbursement for the sulphur plant project.
  • Raised engineering invoice for the refinery execution project.
Candidate Info
3
years in
workforce
1
year
at this job
HS
Mechanical Engineering
BE
Mechanical
MS
Industrial Engineering
3

Project Control Engineer

Responsible for Cost and Schedule Control and Claims Review for various Transportation Agency Projects

  • Developed Master Schedule for fiber optic cable installation project from detailed schedule submitted by the contractor using Primavera. Prepared monthly progress updates along with a detailed analysis of potential delays to the client to enable them to avoid potential claim situations.
  • Monitored progress on a SEPTA Signal Modification project, reviewed monthly schedule updates generated using Primavera to ensure accurate progress reporting.
  • Reviewed a MBTA $6.4M claim, scrutinizing all the documents submitted by the contractor to evaluate the claim; interviewed personnel involved in the project from the client's as well as from the contractor's side.
  • Developed and implemented manpower utilization and control procedures.
  • Implemented cost control / monitoring procedures on various projects from NJ Transit.
Candidate Info
5
years in
workforce
3
years
at this job
BS
Civil Engineering
MS
Construction
4

Project Control Engineer

Management contracting (MC) of electrical, control and signaling erection supervision of Tehran urban railway (Metro)
(Commissioning, Site Supervision, Technical Inspection, Engineering Support)

  • Coordinated workflow within the engineering team
  • Planned and controlled the projects, Using MS project 2003
  • Prepared installation and commissioning schedule
  • Prepared regular weekly reports and efficient use of earned value management methods
  • Managed budget and project progress
  • Provided timely reports and feedback for tasks trending away from the plan
Candidate Info
4
years in
workforce
4
years
at this job
BS
Electrical Engineering
5

Project Control Engineer / Parsons

Analyzed and developed a new (WBS) Work Breakdown Structure for activities during the awarding process.

  • Created the (BLS) Base Line Schedule and studied the acceptable (FF) free float and (TF) total float for each phase.
  • Developed the implements plan versus actual progress curves. Report and analyze monthly deviations from plan.
  • Evaluated the critical paths in the project schedules and evaluated alternative schedule options to identify optimum project strategies or resolve problems before and during execution
  • Prepared and administered all aspects of schedule planning and control including change management and vendors.
  • Established quality control plans as well as the safety plans for each project.
  • Performed resource loading and leveling, logic diagrams and analyses, critical path two week looks ahead, and overall network analysis for senior management decision making
Candidate Info
4
years in
workforce
3
years
at this job
BS
Civil Engineering, And Construction Project Management
6

Senior Project Control Engineer

Member of Project Management group to implement Federal regulations and Department of Energy (DOE) guidance.

  • Interpreted FAR, DOE, EPA, RCRA and CERCLA (Superfund) legislation, and other government regulatory documents.
  • Introduced methodology to identify requirements in departmental procedures.
  • Coordinated submittal of DOE Quarterly Project Manager Progress Report for Congressional Line Item projects.
  • Provided input to small project risk analyses for level of management control needed.
  • Established department records management program and trained project managers and respective staffs.
  • Prepared SRS Records Retention Schedule for the 100+ projects underway in accordance with NARA, DOE and GSA guidelines.
Candidate Info
18
years in
workforce
6
years
at this job
BA
English
Environmental & Hazardous Waste Management
National Record Archives
7

Project Control Engineer

  • Identified company-wide problem of high turn-over rates among new employees, developed and presented Talent Management Program to senior management, securing initial $250,000 budget to launch globally
  • Worked with team of four to originate joint venture in Colombia ensuring compliance with Colombian legal, tax, and labor regulations and preemptively addressing sources of conflict between joint-venture partners
  • Developed and maintained project control systems for engineering and construction projects generating revenues of $1.4M to $3.4BN in Colombia, Turkmenistan, India, and the Philippines
  • Responsible for project P&L, establishing cost control system while forecasting monthly and quarterly revenues presented to management on a monthly basis
  • Innovated procedure for staffing 500 employees, which was eventually adopted at a firm-wide level
  • Selected out of 1500 employees to accompany CEO to Credit Suisse Conference, NASDAQ Opening Bell Ceremony, and represent company at the Women's Global Leadership Conference in Energy & Technology
Candidate Info
10
years in
workforce
8
years
at this job
BS
Industrial Engineering
MBA
Master of Business Administration
8

Senior Project Control Engineer

Responsible for preparation of Engineering, Procurement and Construction (EPC) schedules for a Nuclear Power Plant project.

  • Specific responsibility for Valves, Auxiliary Equipment procurement schedules and Plant Instrumentation and Control Engineering and Procurement schedules.
  • Determined accurate schedule logic to incorporate into the construction schedule to form an Integrated Project Schedule (IPS) of over 130,000 activities.
  • Trained and mentored less senior Project Schedulers on scheduling techniques and correct application of the Primavera P6 Project Management software.
  • Responsible for performing database manipulations in support of the Project Month End Publication of the IPS to the Client. Manipulations included but were not limited to establishing the baseline for the month end publication, establishing the critical path for the publication and generating reports.
  • Developed plans for Nuclear Plant outages.
Candidate Info
20
years in
workforce
2
years
at this job
BS
Mechanical Engineering
Architectural Engineering
9

Project Control Engineer

  • Performed a number of control tasks as a key member of a multi-projects task force.
  • Developed and maintained scheduling controls system utilizing Primavera software resulting in accurate and timely project tracking for local and international projects.
  • Set up and updated project review graphics utilizing Harvard Graphics, provided graphics design resulting in effective visualization of complex issues.
  • Produced weekly home office man-hour progress reports utilizing Lotus 123.
  • Assisted with contract administration and provided conceptual estimates contributing to advance project planning.
  • Researched and developed the outline used by the department manager to teach the Project Controls segment of construction management seminars.
Candidate Info
1
year in
workforce
1
year
at this job
BS
Drafting And Design Technology
MS
Construction Management
10

Senior Project Control Engineer

Planned and scheduled Heavy Duty Engine Platform projects as member of Project Management Office (PMO), maintaining high level documents to support engine platforms.

  • Developed and maintained project plans using Microsoft Project and OPX2 software; reported directly to three Chief Project Managers (CPM); ensured project plans were accurate and project milestones/gates were being met with critical path drivers identified prior to impacting schedule.
  • Directed Hagerstown Legacy Product Phase Out project; led team to outsource manufactured parts of legacy engines for service and aftermarket requirements; ensured selected vendors were qualified to manufacture parts to Original Equipment Manufacturer (OEM) specifications.
  • Managed retro-fit projects on US'04 and US'07 engines to complete engineering upgrades prior to placing engines into commerce; directed flow of materials to five work sites to complete projects on time.
Candidate Info
34
years in
workforce
2
years
at this job
AA
Electronics Technology
BS
Business Administration
MBA
Business Administration

Upload Your Resume for a Free Critique

  • Get personalized feedback on improving your resume to land more interviews.
  • See how you resume performs in automated scanners most employers use.
  • Delivered in 48 hours
In partnership with
Browse
Upload Resume File
Privacy Protected