Planning Engineer Resume Samples

HIGH QUALITY

The best examples from thousands of real-world resumes

EXPERT APPROVED

Handpicked by resume experts based on rigorous standards

DIVERSE EXAMPLES

Tailored for various backgrounds and experience levels

Planning Engineers develop the best methods for construction activities and determine the optimal sequence of operations on the construction site. Responsibilities shown on example resumes in this field include updating and monitoring the contract schedule, performing and implementing the mitigation plan (claims) for expediting the schedule, and monitoring and revising schedules for contractors. Sample resumes in the field show that in order to pursue a career in planning engineering, an applicant must possess a bachelor's degree in an engineering-related field.

Looking for job listings? Check out our Planning Engineer Jobs page.

Want 2-3x more interviews (guaranteed)? Get a Professional Resume Rewrite from ZipJob

1

Planning Engineer

Researched and collaborated the data and methodologies for the urban master plan for more than 16 cities in Iraq. Our partners on this massive project were (SGI) an Italian company (Studio Galli Ingegneria).

  • Gathered information- by observing, receiving, and otherwise obtaining information from all relevant sources.
  • Estimated quantities and cost of materials, equipment, or labor to determine project feasibility.
  • Communicated with supervisors by providing information to supervisors, coworkers by telephone, e-mail or in person.
  • Prepared contract papers and collected the authorizations and signatures.
  • Designated, copied and printed contract paper using Word and Excel programs.
Candidate Info
7
years in
workforce
3
years
at this job
BA
Project Management
BA
Civil Engineering
Lean Management
2

Supply Chain Planning Engineer

Completed 6 Sigma DMAIC Blackbelt training, am transitioning to a Blackbelt role

  • Achieved $3.7M inventory reduction by coordinating global material requirements among Drill manufacturing and logistic facilities.
  • Instituted Vendor Managed Inventory (VMI) for Drill product line to consolidate suppliers, increase Point Of Use Availability, improve inventory accuracy and eliminate excess material movement between production plant and warehouse for a savings of $500K.
  • Implemented Plan for Every Part (PFEP) initiatives by creating awareness, providing training for PFEP tools and facilitating PFEP projects for [company name].
  • Piloted enabling business process and aligned planning methods to achieve Consumption Based Replenishment in support enterprise Pull initiative, which led to a 75% reduction in surplus inventory for Castings for a major castings vendor.
  • Achieved $600K inventory reduction for obsolete castings and forgings by identifying and facilitating the disposition aged material.
  • Facilitated project to reduce excess material movement by $50K annually by aligning material delivery locations to storage locations.
  • Developed and maintained detailed reports to measure facility inventory and identify opportunities for inventory reduction.
Candidate Info
11
years in
workforce
5
years
at this job
BS
Engineering
3

Senior Planning Engineer

Provided recommendations to optimize pipeline, measurement, regulation, and compression facilities to serve new markets. Prepared FERC filings for new facilities. Authorized posting and sale of pipeline capacity. Trained new engineers.

  • Developed computer models of the pipeline system and ran simulations to determine the optimum facilities to install.
  • Worked closely with Project Management and Gas Control Departments and with field personnel to design cost-effective facilities. Prepared operations manuals.
  • Recommended a design change to flow gas into the interstage of an existing compression station rather than building a new station, saving $10 million.
  • Recommended the drilling of additional Storage wells rather than the installation of new compression, thereby reducing storage expansion costs in Ohio by $5 million.
  • Trimmed $3.5 million off the cost to expand service to Northeast Ohio by thinking 'out-of-the- box'
  • Utilized two pressure regimes on parallel pipes and increased line pack in order to creatively serve Cinergy's hourly requirement, saving several million dollars worth of facilities.
  • Received several unsolicited written compliments from Marketing and Project Management for exceptional service, teamwork, and creative thinking.
  • Creatively enhanced existing compression and regulation facilities to enable service to two new power plants. The numerous details were completed on time and worked well.
  • Initiated and justified numerous revenue generating projects and saw through to completion.
  • Initiated and designed a much more functional system for retrieving measured volumes.
Candidate Info
16
years in
workforce
16
years
at this job
BS
Petroleum Engineering 36 Gpa
4

Lead Network Planning Engineer/consultant

Lead network planning engineer/consultant for a network consulting firm in Tampa, FL servicing many Fortune 500 companies and MacDill Air Force Base.

  • Standardized the IOS images for 400 network routers and switches for a pharmaceutical company which spanned 48 states.
  • Designed, configured, and implemented disaster recovery site using overlay transport virtualization (OTV) on Cisco Nexus 7010 data center core switch for customer's VMware server farm just before Hurricane Irene struck in August 2011.
  • Implemented Cisco ASA 5505s for VPN point to point dial solutions with multiple vendors and implemented Cisco ASA 5585Xs with IPS modules at client's data centers.
  • Implemented quality of service on Cisco network infrastructure to support Avaya voice over IP solutions.
  • Provided on the job training to current network engineering team on security best business practices, policy based routing, quality of service, and access control lists.
Candidate Info
18
years in
workforce
8
months
at this job
BS
Bachelor of Science
5

Network Planning Engineer III

Evaluated new technology, SONET High-speed Lightwave equipment, DWDM, etc.(Lucent, Nortel).

  • Designed OC-192 engineering standards for cross country 4F-BLSR Rings.
  • Served as Nortel Vendor Technical Manager and chaired monthly meetings.
  • Created new technology deployment schedule to include strategy, timeline, and direction of entire dept.
  • Created detailed Product Integration Documents (Lab test specs) for backbone transmission equipment.
  • Created Point of Presence & Shelter Strategy Documentation
Candidate Info
3
years in
workforce
8
months
at this job
Computer Science
6

Planning Engineer

Planned and Supported Management of project capital size of $35 million

  • Respond to applying and securing API Q1 & ISO 9001 license
  • Coordinated activities with Manufacturing, Purchasing, Inventory Control
  • Advised Threading Line work order and EMI inspection work order
  • Schedule and expedited the production to meet customer shipping dates.
  • Analyzed, tracked and monitored performance of individual work orders.
Candidate Info
2
years in
workforce
5
months
at this job
BA
Chemical Engineering
MA
Chemical Engineering
7

Logistics Planning Engineer

Analyzed and documented current processes in logistics, procurement, supply chain and operations. Studied and learned new processes as introduced through the implementation of SAP, and developed future state flow maps. Gathered VOC from associates for needs within the new system.

  • Communicated with the core systems team and assisted in the development of MGPP in SAP to close gaps from currency legacy system SAP.
  • Created process flow maps for over 30 functions in the current state.
  • Learned a 30+ year old system and all the different roles in supply chain to tie together with the new system, then identified gaps.
Candidate Info
14
years in
workforce
1
year
at this job
8

Planning Engineer, Ip/vpn Managed Services Delivery

Coordinated delivery of IP/VPN services and equipment to multiple medium and large business customers; interacted with internal groups and external vendors to deliver services within Service Level Agreement (SLA) guidelines.

  • Completed 2100+ site PIP implementation for large international Fortune 500 customer.
  • Completed 2500+ site IP/VPN implementation for Fortune 500 retailer.
  • Delivered results on goals driven by customer SLA's and internal metrics @ 98% on-time completion rate.
  • Partnered with Project Management team, Customer(s), Field Technicians, and Provisioning & Logistics.
  • Lowered Cost Per Order by 16% overall in 2009.
  • Reduced order backlog by 24% (Domestic and International).
  • Achieved 92%+ of orders completed on or before original Customer Desired Due Date
Candidate Info
25
years in
workforce
6
years
at this job
AS
Associate of Science
BFA
Bachelor of Fine Arts
9

Production Planning Engineer/production Supervisor

Initiated and completed process routing system and set labor efficient standard using PSI ERP system

  • Oversaw the entire plant and provided recommendations to increase machine utilization
  • Conducted plant optimization by reducing raw materials, inventories and floor space utilization
  • Controlled product quality, productivity and labor cost in a unionized environment
  • Provided appropriate level of floor support by liaising with operators and functional groups to review processing issues and resolved with sound and lasting corrective actions (CA)
  • Actively participated in "real time" preliminary material review (PMR) and material review board (MRB) activities
  • Computerized a costing system which improved quotation efficiency by 75%
  • Responsible for production line scheduling and supervision of 50-65 people
  • Maintained operating metrics and cognizance details related to first time yield, on time delivery, and reduced cost of operation
Candidate Info
11
years in
workforce
6
years
at this job
BS
Mechanical Engineering
10

Energy Planning Engineer

Advised engineers on climactic conditions at project sites around the world; frequently travelled on-site to maintain weather towers and equipment.

  • Analyzed large data set collected at multiple utility scale solar PV sites, ranging between 5MW and 80MW.
  • Worked closely with instrumentation engineers on placement of sensors in large PV power plants.
  • Developed new meteorological station mast for use in FS plants.
  • Used MAT LAB, PVSyst, and MS SQL during work.
Candidate Info
6
years in
workforce
2
years
at this job
BS
Meteorology
Renewable Energy
Atmospheric Science

Free Professional Resume Critique

We have partnered with TopResume to bring you a FREE resume critique service. Upload your resume and within 48 hours TopResume will email you a detailed analysis of what hiring managers and automated systems think of your resume – and how to improve it.

Browse
Upload Resume File